Functions:
- The activation of test steps takes place over CAN and MOST.
- The flash data is provided via a 1 gigabyte switch simultaneously to all test items on these connections.
- Data is retrieved either from the network or locally from the computer.
- A built in router can also make data available across networks.
- The process takes place synchronously for all 10 test items.
- An asynchronous process is possible, since each test item can be freely inserted and flashed without affecting the other test items.
- Each test item is individually locked and scanned.
Components:
- 19” rack, special support system
- 2D Hand scanner
- CISCO router
- 5 electronically controlled drawers in which are 2 test items each inserted
- Industrial computer
- 19” Monitor TFT
- USV measurement data protection
- MCD TestCollection software